April 9 - The final blasting

We got this close!
  post
Another angle.
  edge

We're blasted!

  cliff
The new rock wall between us and the neighbours.
  driveway
I might get Mike (the digger operator) to switch the last couple of rocks.
 

rocks

 

 

April 12

A few extra holes to finish what the first blasting missed. This machine made it look easy.
  drilling
BC Hydro came today and conncted our power line up the driveway. Next week when the big digger comes back, Mike won't have to dodge the power line!
  hydro

April 18

Final blasting done and they're back to remove the blasting matts . We have the driveway back! This is great but be carefull backing down in the dark, there's a mighty big hole to fall into.

 

removal
Oliver and Ian building some footings to keep or house on the cliffop.
  o and I
The new footings. Oliver drilled into the bedrock and anchored them with rebar. Howard now needs a new Makita hammer drill like theirs.
  footing

The excavation is complete! We're now out of destruction and into construction - we actually have swadust on site. Hopefully I won't have to unhook the sewer line again for a bit.

  april 18

May 3

There's always a machine to do the work. This is the wood for the foundation forms arriving.
  wood
Who ever thought our addition would be built with such special wood, and that's just the footing forms
(he said sarcastically).
  good wood
Here's our new $4000 dollar connection to storm drains going in.
  storm
Here's what cost $1000 - the flag guy
  1000
But look at what we got - a fancy cover at the end of the driveway and ten feet of pipe.
  storm