April 9 - The final blasting |
|
| We got this close! | |
![]() |
|
| Another angle. | |
![]() |
|
We're blasted! |
|
![]() |
|
| The new rock wall between us and the neighbours. | |
![]() |
|
| I might get Mike (the digger operator) to switch the last couple of rocks. | |
|
|
April 12 |
|
| A few extra holes to finish what the first blasting missed. This machine made it look easy. | |
![]() |
|
| BC Hydro came today and conncted our power line up the driveway. Next week when the big digger comes back, Mike won't have to dodge the power line! | |
![]() |
|
April 18 |
|
| Final blasting done and they're back to remove the blasting matts . We have the driveway back! This is great but be carefull backing down in the dark, there's a mighty big hole to fall into. | |
![]() |
|
| Oliver and Ian building some footings to keep or house on the cliffop. | |
![]() |
|
| The new footings. Oliver drilled into the bedrock and anchored them with rebar. Howard now needs a new Makita hammer drill like theirs. | |
![]() |
|
The excavation is complete! We're now out of destruction and into construction - we actually have swadust on site. Hopefully I won't have to unhook the sewer line again for a bit. |
|
![]() |
|
May 3 |
|
| There's always a machine to do the work. This is the wood for the foundation forms arriving. | |
![]() |
|
| Who ever thought our addition would be built with such special wood, and that's just the footing forms (he said sarcastically). |
|
![]() |
|
| Here's our new $4000 dollar connection to storm drains going in. | |
![]() |
|
| Here's what cost $1000 - the flag guy | |
![]() |
|
| But look at what we got - a fancy cover at the end of the driveway and ten feet of pipe. | |
![]() |
|